Use galvanized siding nails and make sure that the nails penetrate a minimum of 1 1 4 inches into the framing.
Allura siding installation guide.
And ccmc technical guide requirements as required by the national building code of canada.
Allura fiber cement siding is tested in accordance with astm1186 in the u s.
Xxin accordance with best building practices there should bewall preparation and sheathing a gap between dissimilar materials.
These testing standards include a stringent review of more than a dozen properties such as flexural strength moisture movement frost resistance transversal loading and water.
Xxapply siding over a weather resistant barrier in accordance with local building code.
And a minimum of 7 16 osb or 1 2 plywood sheathing.
Fastener penetration into framing unless indicated otherwise in these instructions 24.
Then you would install your fiber cement corner and window trim.
These testing standards include a stringent review of more than a dozen properties such as flexural strength moisture movement frost resistance transversal loading and water.
Examples of complete materials and installation pricing for typical homes are found below.
Average total cost for allura siding materials and installation supplies.
These testing standards include a stringent review of more than a dozen properties such as flexural strength moisture movement frost resistance transversal loading and water.
Allura fiber cement siding is tested in accordance with astm1186 in the u s.
Allura fiber cement siding installation manualsection 8.
Do not overdrive the nails.
And ccmc technical guide requirements as required by the national building code of canada.
Allura fiber cement siding is tested in accordance with astm1186 in the u s.
Allura fiber cement siding over structural insulated panels thicker than 1.
Allura soffit plycem trim and other accessories.
Xxinstall individual shakes over wall construction with framing spaced no more than 24 o c.
Allura prices per square foot.
Allura siding planks and panels.
7 screws designed for allura fiber cement siding 4 1 1 4 min.
Position your first course of siding inch below the starter strip and nail the siding into the studs 1 inch down from the top of the siding.
And ccmc technical guide requirements as required by the national building code of canada.